The Construction Of Swimming Pool Equipment Engineering, You Must Know These!
Leave a message
The swimming pool water cleaning automation control belongs to the level of the building water supply and drainage project. According to the relevant requirements of the water supply and drainage project, it can be used as a separate branch project. The equipment can be selected and opened to the outside world to carry out the branch project. Equipment supply, construction drawing design, engineering construction installation, system software adjustment and quality engineering acceptance. Therefore, the article will introduce the relevant regulations for swimming pool water treatment equipment and equipment installation in detail.
Engineering construction requirements for circulating water pump generators:
1. It should meet the requirements of the current national industry standards "Code for Construction and Construction Acceptance of Refrigeration Compressors, Centrifugal Fans, and Pumps for Building Engineering Construction" GB50275 and "Code for Construction Acceptance of Quality Control of Building Water Supply and Drainage and Central Heating Engineering" GB50424.
2. The general assembly pump and the swimming pool special type pump for the body dust collector of the bodysuit, etc., can not be disassembled randomly after the equilibrium test has no abnormalities; if abnormal conditions occur, the owner of the community and the delivery company should be notified to carry out the disengagement Check and rearrange the installation.
3. The inlet and outlet of the pump should be installed with flexible products. It should be in the natural condition, and the inlet pipe and outlet flange should be vertical to the pipeline axis. Water pump suction pipe must not have airbags and steam leakage conditions. Reducing diameter should use eccentric reducer, and the pipe top is connected flat. The inlet and outlet of the pump must use a ductile bracket or a ductile fixed bracket. The pressure gauge on the pipeline shall be provided with a buffer device, and a plug valve shall be installed between the pressure gauge and the buffer device.
4. The pressure gauges, gate valves, models and models on the pump's inlet pipe and drain pipe should comply with the design plan, with appropriate locations, convenient postures, and strict leakage; the slope of the suction pipe towards the reservoir should not be less than 0.005. The gate valve on the pump hose should be provided with another support or rubber support, and its net weight should not be pressed on the pump socket to ensure the safety of the pump. The vibration reduction of the pump generator set shall be installed on a concrete base or a channel steel base.
Circulating system water pump generator
Project construction regulations for filter device:
1. Resolve the appearance and internal parts of the equipment before installation, and check to ensure that the parts are complete, the specifications and models meet the requirements of the design plan documents, and the parts are fixed to each other.
2. The compressive strength level, specifications, design elevation, and parts of the concrete of the equipment base conform to the design plan, and the surface is flat.
3. The installation coordinates, design elevation, and level of installation quality of the filtering device and the three oxygen and water touching reaction tanks are checked by means of hanging lines or rulers. The tolerance of the coordinates is 15mm and the design elevation. The tolerance is ± 5mm and the tolerance for levelness is ± 2mm / m.
4. The gate valve on the filtering device and other equipment, the window on the anti-cleaning drainage pipe or the short flowing water pipe should be convenient for actual operation and inspection.
5. The device control components, notes and equipment itself must be tightly and impermeable to water during assembly and installation. The gauge of the pressure gauge should be 150mm straight. The specified working pressure on the instrument panel is 1.0MPa, and the scale is divided into 0.01MPa.
filter device
Installation requirements for simmer water heating equipment:
1. When the heating equipment is connected with non-metallic materials, the pipeline between the equipment transfer port and the non-metallic materials pipeline shall be provided with excessively long metallic materials with a length of not less than 500mm.
2. The inlet pipe and drain outlet of the heated water shall be equipped with pressure gauges, temperature gauges and vent valves. The measuring range of the instrument panel shall not be less than 1.5 times the working pressure of the design plan.
3. The parts of the temperature regulator and other valves on the heat medium pipeline should be convenient for inspection and maintenance, and a solid support point equipment is required.
Installation regulations of ozone generator:
1. Understand the equipment installation instructions and common problems before installation, and check whether the equipment is complete and intact;
2. Check whether the basic compressive strength, location, specifications, design elevation and flatness of the equipment meet the design plan requirements;
3. Materials and specifications such as pipes for trioxide gas transportation, trioxygen injection needles, pressure pumps, etc. shall comply with the design plan or bidding requirements, and their connections shall be strictly reliable, no leakage shall occur, and different identifications shall be required;
4. The materials and connections of the electrical equipment route should meet the requirements of relevant technical standards related to the electrical profession.